Showing posts with label safety strap. Show all posts
Showing posts with label safety strap. Show all posts

Monday, June 20, 2011

Roosevelt Island Tram Safety Straps Placed In Cabins, Shorter People Now Able To Hold On To Bars - Less Wobble Near The Tram Tower But No Air Conditioning For Cabin

Tram Safety Strap Unveiled at Transportation Town Hall Meeting

During last Thursday's Roosevelt Island Transportation Town Hall Meeting,

Image of Roosevelt Island Town Hall Meeting

Roosevelt Island Operating Corp (RIOC) Vice President of Operations Fernando Martinez announced that safety straps will soon be in place on the Roosevelt Island Tram Cabin holding bars. Soon arrived on Saturday as the Safety Straps were installed and being used by Tram Passengers.


Another issue involving the Tram was asked by this reader recently:
I just realized last week that the Tram does not have A/C because we were sweating buckets. Do you know why they did not decide to add A/C to the new Tram? Was it just a matter of cost?
I replied:
I think it was a function of cost as well as the limited time of the trip - approximately 4 minutes
Roosevelt Island Operating Corp (RIOC) Director (or perhaps former Director?) Jonathan Kalkin answers the reader's question:
Really has to do with weight and the amount of passengers we would have to lose each trip. The new tram with an AC unit would have held less people and the battery to charge the AC wouldn't have enough time to charge at the station. However, I noticed that they haven't opened up all the windows when I was on it. All windows should be open which should really cool it down. I took pictures, sent it to Ops, and they are talking with the Tram team to make sure they open all the windows.
How often do any of the other RIOC Directors ever answer resident questions like Mr. Kalkin does on a regular basis? Just another reason to keep Mr. Kalkin on the RIOC Board.

Also, have you noticed any change in the Tram shaking when it nears the Towers on it's trip over the East River? I certainly have noticed much improvement recently after RIOC made mechanical and electrical improvements to the Cable suspension. 

UPDATE 11:55 AM - Mr. Kalkin adds:
Very happy to see the Tram straps and stabilization systems starting to work that I ordered to have studied and fought for on the Operations Committee . Many residents including myself had noticed these issues and I thought the best way to highlight them was to have RIOC President Leslie Torres and Fernando Martinez RIOC VP of Ops ride with me on the Tram awhile back to see it firsthand. Additional poles were discussed as well however that is probably something that has to examined more closely to see if these improvements are the only possible or sufficient ones.  It is great to see ideas from the people of this Island translate into real action.
Here's how the process of community input to RIOC Board action began.

Friday, June 3, 2011

Roosevelt Island Tram Running Single Cabin Next Two Weekends For Electrical and Mechanical Improvements To Cable Suspension - Smoother Ride and More Ways To Hold On Coming Soon


Previous post this week reported that the Roosevelt Island Operating Corp (RIOC) will  be running a single Roosevelt Island Tram cabin this weekend and next due to electrical and mechanical improvements being made to the cabin suspension.

A reminder from RIOC:
As a reminder, on Saturday, June 4th - Sunday, June 5th, the Tram will be operating a single cabin only due to electrical improvements to the cabin suspension. During this time, the Tram will provide service every 15 minutes. Normal service will resume on Monday, June 6th at 6 AM.

Sincerely,

Roosevelt Island Operating Corp Advisories Group
RIOC Director Jonathan Kalkin adds:
Very excited to announce that we are starting work on the improvements to the Tram residents have asked for and I  have been advocating for on the Operations Committee. People want a smoother ride especially on the towers and RIOC will be testing improved suspension features to provide that. People have also asked for more ways to hold on during the ride and that is coming soon as well.
Mr. Kalkin promised these improvements would soon be coming in an April post and it looks like he was right:
..The other day I had the opportunity to be on the Tram with our VP of Operations Fernando Martinez and RIOC President Leslie Torres. I had mentioned during previous meetings that I had gotten several emails or comments that there were not enough places to hold onto currently. I'm 6 feet tall and the rack on the top was still high over my head. I told Fernando that we should either lower the current poles on the top, add some kind of retractable strap to hold onto that doesn't hit people in the face, add extra vertical poles, or some combination of the three. There may be alternative solutions so I asked that we have an expert look at it again to figure out a fix.

I also have seen, read or experienced myself movement on the Tram while it approaches the towers. The Tram is different from the old Tram in that it uses a fixed cable system and therefore can be used in higher winds because the cables are fixed and don't move. Therefore the Tram cable can't swing on the trip in high winds. It remains fixed. However, when approaching the towers the Tram will center itself which is why you feel that nudge. This is very similar to a speed bump. If the operator moves quickly through it, it is more severe and during high winds, the correction is bigger. I have asked during several operations meetings that we develop a procedure for this during regular operations and high wind situations. If we have to go slower when approaching the tower in order to give a more comfortable ride, I think we should. It just makes sense....
Image of Tram Passengers Holding on to Overhead Bars

Thursday, April 14, 2011

View From Roosevelt Island Tram if Patrolled By Miami Vice's Crockett & Tubbs - Questions on Tram Safety Strap, Tower Bump & Recent Outages Answered

Here's the view from the Roosevelt Island Tram if it was patrolled by Sonny Crocket and Ricardo Tubbs from Miami Vice.



The Tram would go much faster if Crockett and Tubbs were patrolling it.

Some tram riders, though they appreciate the great views of NYC waterfront and skyline, just want to be able to hold on and not fall down during the ride.

 Image of Some Tram Riders Stretching to Hold on to Bar

Received this message from a reader explaining:
there really does need to be straps, metal or leather...if the red bus can have straps, the Tram can for sure...hope they get on that soon, it is like the Tram cars are not finished or they just forgot to make sure 100 people had somewhere to hold onto while in the air?
Roosevelt Island Operating Corp (RIOC) Board Director Jonathan Kalkin has some answers on safety straps, the tram bump near the towers and recent outages:
The other day I had the opportunity to be on the Tram with our VP of Operations Fernando Martinez and RIOC President Leslie Torres. I had mentioned during previous meetings that I had gotten several emails or comments that there were not enough places to hold onto currently. I'm 6 feet tall and the rack on the top was still high over my head. I told Fernando that we should either lower the current poles on the top, add some kind of retractable strap to hold onto that doesn't hit people in the face, add extra vertical poles, or some combination of the three. There may be alternative solutions so I asked that we have an expert look at it again to figure out a fix.

I also have seen, read or experienced myself movement on the Tram while it approaches the towers. The Tram is different from the old Tram in that it uses a fixed cable system and therefore can be used in higher winds because the cables are fixed and don't move. Therefore the Tram cable can't swing on the trip in high winds. It remains fixed. However, when approaching the towers the Tram will center itself which is why you feel that nudge. This is very similar to a speed bump. If the operator moves quickly through it, it is more severe and during high winds, the correction is bigger. I have asked during several operations meetings that we develop a procedure for this during regular operations and high wind situations. If we have to go slower when approaching the tower in order to give a more comfortable ride, I think we should. It just makes sense.

Finally, there has been a lot of confusion during Tram outages. We haven't had many, but they have been mostly due to the fact that our Tram has so many sophisticated sensors that detect the smallest issue. This is a good thing. We don't have to rely only on inspections or deal with failures once they happen. We can get that data immediately years before they even start to be an issue. One of the reasons I held back the vote for the Tram when I first got on the Board was I wanted to examine every case where a Tram had failed. I wanted to know why because safety is always the number one concern when dealing with transportation. Since most Trams are built outside this country, I had the court documents translated into english so the RIOC staff, Board and I could review them. We found two major factors to be the issue: improper maintenance and old safety mechanisms. In almost all cases it was a combination of both. Our previous Tram had 1970's technology and the same safety equipment and standards of that decade with some modifications. Our new Tram has redundant safety systems and computer safety sensors in place that simply didn't exist during that period. This is good. I have asked that if we know specifically if there is an issue, that we get the message out, but we make sure it is the right information. So we can better address these issues and questions during our next Operations Meetings, I placed a question on Quora. I look forward to hearing your responses.