Showing posts with label river road. Show all posts
Showing posts with label river road. Show all posts

Wednesday, May 15, 2013

Local Law 11 Facade Work Continuing At Roosevelt Island's Manhattan Park - River Road Completely Closed To Traffic Until Further Notice Says Building Management, Residents Ask When Will Work Be Completed?

Image Of Manhattan Park's 10 River Road Yesteday

A Manhattan Park resident forwarded this announcement from the Manhattan Park Management:
May 13, 2013

All Residents

Manhattan Park

Roosevelt Island, N.Y. 10044

Dear Residents:

On Tuesday May 14, 2013, River Road will be completely closed to vehicle traffic due to Local Law 11 work from 7:00am until further notice.

Please remember that there will be NO VEHICLE TRAFFIC on River Road and absolutely NO PARKING in the restricted area until further notice.

If you have a vehicle parked on River Road after midnight tonight, it will be towed.

Thank you for your cooperation and we apologize for any inconvenience.

Manhattan Park Management


NYC Local Law 11 concerns:
... inspection of the exterior walls of buildings greater than six stories in height....
Residents of Manhattan Park expressed concern yesterday over the unknown length of time they will be inconvenienced by this work and how long it will be "until further notice" is reached.

Image of Manhattan Park's 30 River Road Yesterday

Residents expressed the following concern:
Any one get a clear indication on when the work might be done?

I'm in building 30, and I'm a little nervous about the windows being sealed up when the summer rolls around...

I'm surprised there hasn't been any specific notice.  I realize management doesn't want to commit and not deliver, but if they've been working on 40 for going on 10 months, and they're about to start 30, we should expect it to go through the summer AND the winter.

I'll have a newborn in the apartment in the middle of the summer, so it doesn't work to not be able to control the temperature at any time.

I realize they're not giving "concessions" on the rent during the work, but perhaps release from the lease should we have to move.
Another:
My biggest concern is about the lack of AC usage especially at night. Should we ask for a Town Hall meeting so we can get clarification?
 Another:
Good luck with getting any information from Manhatten Park.  They tell you nothing.  Be prepared for the worst Buildings 10 and 30.  This ordeal is a horrible experience.  The noise during the day at times is unbelievable.  Yes, your windows and balcony gets taped up for the duration.  I did not use my heat during the evenings and weekends.  In the middle of winter it was freezing.  They did supply us with space heaters.

I cannot wait for them to be totally finished so we can have normalcy again.  Shame on Manhatten Park for not giving us proper notification on this project.  2 weeks notice is not enough notice to clean off your balcony when you can't use it for a year.  They left off the part that it was going to take a year.  Had we had known that, we could have put our balcony stuff into our storage unit in Queens.
And another:
We are in 40 and they have been at it for months now. I called the office and was told that they will be done with my building by the end of June.

In regards to the air conditioners I was told that they will install filters. You may want to call management for more details.
There were 2 cars parked on River Road last evening.

Monday, September 3, 2012

Roosevelt Island's River Road By Manhattan Park Closed To Parking And Traffic Due To Necessary Construction Starting Tomorrow And Regular Off Peak Tram Service Back To Normal Advises RIOC

Image Of River Road By Manhattan Park

According to the Roosevelt Island Operating Corp (RIOC);
Effective Tuesday, September 4, 2012 and until further notice, due to necessary construction River Road will be completely closed to parking and traffic, Monday through Friday from 8:00 AM to 5:00 PM.

We apologize for any inconvenience, and thank you for your cooperation.
RIOC also reports that regular Tram service has returned:
Please be advised the Tram Station Renovations have been completed and Off-Peak Tram Service has been restored.

Sincerely,

Roosevelt Island Operating Corp Advisories Group

Friday, March 4, 2011

Fire At Manhattan Park's 2-4 River Road On Roosevelt Island Reported This Morning

Image of FDNY On Roof Of 2-4 River Road, Roosevelt Island From Trevre Andrews

Received reports of a fire at 2-4 River Road just after 10 AM from Roosevelt Island resident Trevre Andrews. Mr. Andrews sends in these two videos showing smoke rising from the building and the FDNY on the roof. (Enlarge the video for a better view)





Also, Rjhiphop tweeted:
There is a fire on Roosevelt Island...
I have asked RIOC and the Public Safety Department for more details and will post when received.

UPDATE 3:25 PM - Roosevelt Island Public Safety Director Keith Guerra explains what happened:
There was no fire at that location.  There were 2 aided cases back-to-back.  That was the reason for all the Fire Trucks.  Remember that EMS in New York City is run out of FDNY, so they feel the need to respond sometimes.
I replied:
Thanks for the explanation though I do have pictures and video of FDNY on the roof of the buildings in fire gear.
Director Guerra adds:
Nice pictures, but again there was no fire.  What occurred was a smoke condition in the laundry room's duct vent system, which went all the way up a line to the roof.  The Firefighters were just venting the smoke out of the system.  Manhattan Park Management & Supers were on the scene.  The 2 aided victims were transported to Mt. Sanai to be evaluated for smoke inhalation.

Monday, May 11, 2009

Manhattan Park's River Road Blocked Again - This Time For Main Street Repaving

Main Street Turn To River Road Blocked For Repaving

I was walking by Manhattan Park on Sunday and saw an unwelcome but familiar site. The turn from Main Street to River Road was blocked off again just as it was last December. This time the reason for the road closure was not to repair an underground water leak but to continue the Main Street Pavement reconstruction. According to RIOC:
Pavement Reconstruction Advisory

Weather permitting, contractors will continue working around New Main Street. The work will take place for the week of May 4th and buses will have to be re routed for a day or two around Sports Park.

Also the continuation of Main Street Pavement Reconstruction from 40 River Road/Main Street to the Octagon Soccer Field Comfort Station entrance.

One lane will be created and the work will be performed in two halves, first half will be on the North bound lane for two weeks and second half will be on the south bound lane for two weeks as well.

While the work is in progress 40 River Road bus stop will have to be relocated .