Showing posts with label subway tunnel. Show all posts
Showing posts with label subway tunnel. Show all posts

Tuesday, October 29, 2019

Happy Birthday To Roosevelt Island Subway Station Service Which Began October 29, 1989 - No More Late Night Walking Thru Subway Tunnels From Manhattan To Get Home

Happy 30th Birthday to the Roosevelt Island subway station service and the MTA' 63rd street tunnel which opened October 29, 1989.


Hard to imagine for us newcomers, those who moved here after 1989 what public transportation was like before the subway with only the Tram to get back and forth to Manhattan.

I'm told by Roosevelt Island old timers that before the subway opened, some took late night walks through the subway tunnel to get home from Manhattan.

Take a look at these 1970's MTA videos about building the 63rd street subway tunnel staged, at what was then Welfare Island,


which was scheduled to open for subway service in 1976



and construction



of the Second Avenue Subway

Monday, July 17, 2017

Roosevelt Island F Train Service Disruptions This Afternoon Due To Smoke Condition In 63rd Street Tunnel - FDNY On Scene

According to the MTA:


Thursday, February 11, 2016

Getting On Roosevelt Island F Subway Train Weekday Mornings Is Like Mission Impossible Says Rider - Resident Dreams Of Another Station For E & M Trains Being Built Under Southpoint Park

The picture below shows NYC subways lines superimposed over map of Queens and Manhattan. You can see the subway lines that travel beneath Roosevelt Island.
  • The F train and LIRR East Side Access Project use the 63rd street tunnel,
  • N, Q and R Train use the 60th Street Tunnel and
  • E and M Train use the 53 Street Tunnel.
A Roosevelt Island resident dreams of:
WOW! I dream of a day when we have access to the E/M subway lines under Southpoint Park. [I can dream can't I]. Maybe once Cornell is up and running.
How many people use the Roosevelt Island F Train subway station?

According to the MTA, the average annual weekday Roosevelt Island subway ridership statistics have been declining since 2010.
  • Year 2009 - 5,816    
  • Year 2010 - 7,870    
  • Year 2011 - 6,576 
  • Year 2012 - 6430 
  • Year 2013 - 6,321
  • Year 2014 - 5,998
 According to the MTA, the annual Roosevelt Island ridership statistics are:
  • Year 2009 - 1,875,228
  • Year 2010 - 2,580,003
  • Year 2011 - 2,114,468 
  • Year 2012 - 2,026,567
  • Year 2013 - 1,948,925
  • Year 2014 - 1,870,476
In 2011, the Second Avenue Sagas Blog had an interesting article and comments about improving Roosevelt Island subway by:
... exploring a new subway stop for the island. The 53rd St. tunnel passes directly underneath what will be the southern end of the Cornell campus. There’s no station right now, and I have no idea if one is even technically or economically feasible....
Capt Subway commented on Second Avenue Sagas:
The proper grading for a stop in the 53rd St tubes is simply not there. You need essentially a level grade for about 600 ft, or as close as possible to 600 ft. Besides there is ample capacity at the Roosevelt Island stop. Ample train capacity would be achieved by putting the “F” back in 53rd St, where it belongs, and routing the much more lightly loaded “M” into 63rd St. In so doing you’d eliminate all the ridiculously slow and delay generating switching moves at Queens Plaza & 36 St. Nights & weekends when the “M” quits the “F” could be be rerouted to 63rd St....
Click here for the full Second Avenue Sagas discussion.

Monday, April 18, 2011

Roosevelt Island Subway Station Doors Still Broken After More Than a Year, Borough President Scott Stringer Wants Answers From the MTA - Here's How F Train Came to Roosevelt Island Via 63rd Street Tunnel

Image of Broken Door at Roosevelt Island Subway Station Entrance From Trevre Andrews

The door to the entrance of the Roosevelt Island subway station is still broken but that has not stopped resident Trevre Andrews from trying to get the attention of the MTA F Line General Manager to fix the door. Last month Mr. Andrews emailed the F Line General Manager asking:
The street level door at the Roosevelt Island F train station has been broken for more than a year now.  Could we please have it fixed?  Thanks.

See below, it looked about the same this morning.
Last week, Mr. Andrews tried again emailing the F Line General Manager:
I went through the F-train station today on Roosevelt Island and see that now 2 out of the 3 doors are broken.  Can you let me know what the plan is for repairing them?  Thanks.
The Manhattan Borough President Scott Stringer is now on the case as well but Mr. Stringer is going right to the top of the MTA with this letter to MTA Chairman Jay Walder. (Link to letter in Google Docs)

Roosevelt Island Subway Station Letter to MTA

Mr. Stringer's letter is as a result of this meeting held last month in which the Borough President spoke with a group of Roosevelt Island residents about a variety of issues concerning Roosevelt Island. At the meeting, Mr. Stringer promised to contact the MTA about the subway door and platform leak which he mentioned in the letter. Another subway issue which was discussed at the meeting with Mr. Stringer was the disgusting perennial pigeon poop plaguing the Roosevelt Island station but that unfortunately has not made the letter to the MTA Chairman.

We shall see if Borough President Stringer has any better luck in getting the Roosevelt Island subway door entrance fixed than our own resident Mr. Andrews. If he does, then let's start working on the pigeon poop.

Have you ever wondered how subway service came to Roosevelt Island in the first place? Here's a fascinating video via Second Avenue Sagas showing how the F Train came to Roosevelt Island by way of the 63rd Street Tunnel.


You Tube Video on Making of East River Subway Tunnel via 2nd Ave Sagas

Monday, February 11, 2008

Why the Constant F Train Subway Disruptions at Roosevelt Island



A reader of this post asks a very good question.
A bronze plaque should go to whomever is able to get the MTA to state when the weekend shutdowns will end permanently. Every other capital project of the MTA's has a start and an end date. Except, it seems, this one. And what is the tunnel work for? The LIRR East Side connection? Tunnel reinforcement to protect agains terrorism? I'd love to know.
Long time Roosevelt Island residents know that work repairing the Roosevelt Island Station and train service is nothing new as evident from this 1998 NY Times article.
Only eight years after it opened, the 63d Street subway tunnel will be partially shut Sunday for repairs that will last 15 months, causing extra transfers and long waits for approximately 12,000 riders daily in Manhattan, Roosevelt Island and Queens, New York City Transit announced yesterday.
... The need for a $44 million repair job -- workers will tear up the track, lay new cushioning pads and anchors and replace the track -- was first made public in 1995, only six years after the tunnel project was completed at a cost of $868 million. But the advance warning did not make the inconvenience go down much easier.
... The 3.2-mile-long tunnel was built using an innovative but flawed design that called for laying the rails in shallow epoxy-and-sand pads instead of atop conventional railroad ties. The design allowed for a slightly smaller tunnel, but the pads began to crack soon after the tunnel opened.
Does anyone know the answer to what the tunnel work is seeking to accomplish?