Tuesday, June 24, 2008

Sidewalk Installed at Blackwell Turnaround

Work has been completed decreasing the size of the Blackwell Turnaround allowing vehicles more and safer room to maneuver as well adding a paved pedestrian sidewalk with ramp to the area. It is now much easier to cross the street. Good job by Keith Guerra and the Public Safety Department in fixing this potentially dangerous crossing point.