Roosevelt Island Z Brick Repair Work Starts Tomorrow at West Drive and Lighthouse Park
According to the Roosevelt Island Operating Corp (RIOC):
Please be advised on Thursday, September 6, 2012, Z-Brick repair work will begin at two locations:
1) On the West drive and sidewalk in front of the R.I. Historical Society Kiosk (between the kiosk and the tennis bubble).
2) Inside Lighthouse Park (z-brick replacement around tree pits)
During the Z-brick repair work on the West Drive, flag men will be on-site and will assist with vehicular traffic as necessary. The work is estimated to be completed at both locations by Friday, September 14, 2012.
Sincerely,
Roosevelt Island Operating Corp Advisories Group