RIOC Approves $11 Million Renovation Of 56,000 Sq Ft Roosevelt Island Sportspark Recreation Facility Beginning This Summer, New Locker Rooms, Mechanical Equipment, Gym Flooring, Weight Room, Adminstrative Office & More - Phased Work Will Allow Pool To Stay Open For Summer, Gym Will Close

The Roosevelt Island Operating Corp (RIOC) reported today:

Please be advised that mobilization will begin in late April for the highly anticipated renovations on the Sportspark facility. The renovations will include the installation of energy-efficient systems, the addition of a fitness center, a multi-purpose meeting and event space, as well as upgrades to the gymnasium, locker rooms, and building façade. Please note that the work will be completed in phases, with regular updates to the community on the progress of the project.

The $11 million Sportspark recreation facility

renovation plan was approved during the March 16, 2021 RIOC Board of Directors meeting (video of meeting here).  

According to this March 11 memo excerpt from Project Coordinator Michelle Edwards to RIOC President Shelton Haynes in support of the Sportspark Renovation Project award for construction to Vanguard Construction & Development Co:

Sportspark is a state-provided recreation facility that serves Roosevelt Island and the community. The Sportspark Building consists of two floors and is approximately 56,000 gross square feet. After 40 years of use, the facility is in need of infrastructure and general renovations to accommodate current and future programming and operational needs. 

The Sportspark Renovation project entails demolition and removal of existing mechanical, electric, and plumbing (“MEP”) infrastructure serving the East and West portion of the facility; and the installation of two new HVAC units and new ductwork in the Eastside pool area. In addition to this, installation air handling units will also be installed, as well as unit heaters, among other renovations on the east and west side locker rooms. Steel dunnage will be done for HVAC on the roof; and upgrades to the fire alarm, and a BMS system, will also be installed in the facility. 

For Sportspark, architectural upgrades include reconfiguring locker rooms, upgrades to finishes, and new light fixtures on the East and West Side. Work on the Westside consists of a new administration office, new reception area, new weight room, a renovated multipurpose room for the second floor, and new gym flooring. Finally, upgrades will be made to the main Westside entrance with a new curtain wall and exterior cladding with “Sportspark” signage....

And:

... RIOC Capital Planning and Projects recommends – subject to the satisfaction of all contracting requirements, that the Board of Directors authorize and approve entering into contract with Vanguard Construction & Development Co., Inc. for providing construction services for the Sportspark Renovation Multiphase Project for a total amount of $ 9,931,152.00 with a 20% contingency of $1,986,230.40, bringing the total authorized not-to exceed amount to $11,917,382.40.

RIOC Chief Financial Officer John O'Reilly reported to the RIOC Board Directors during the March 16 meeting that the Sportspark renovation work timeline will be done is separate phases starting from the west side of the building beginning with the lobby and then to the east side pool. The Gym will close for the summer and reopen in September.The Sportspark Pool 

will remain open throughout the summer and then close for renovation which is expected to be completed by spring 2022.

Mr O'Reilly added that a new gym floor will be placed on top of the existing gym floor instead of repairing the existing damaged floor in order to avoid:

... an environmental issue. The glue that was used to put the floor down back in the day is now no longer used because of environmental issues. So what we are going to do is similar to what we did in Southpoint Park. We're going to cap it and lay a new floor over the top of it so we don't have to take the floor up and deal with the environmental hazard of the glue issue that's on the bottom of the floor....
Here's the discussion of Sportspark

RIOC Board Meeting - March 16, 2021 from Diva Communications on Vimeo. 

renovation timeline.

Thursday, February 28, 2019

Hey Susan - RIOC President Susan Rosenthal Answers Roosevelt Island Residents Questions On Dog Run Site Selection Safety, Tram Station Elevator, Motorgate Electric Car Charging Stations, Seawall Replacement, Sportspark Locker Rooms & More

Roosevelt Island Operating Corp (RIOC) President Susan Rosenthal answers your questions in this fifth installment of Hey Susan feature.


HEY SUSAN!

An occasional column of questions and answers to and from RIOC President and CEO Susan Rosenthal

HEY SUSAN!

I have a few concerns. There was considerable talk that the dog park would be moved to the area just south of 480 Main Street and adjacent to the sprinklers and playground. This area is already congested in the summer with considerable foot, bike, and RIOC vehicle traffic. Has there been a decision where the permanent home will be for the dog park and if 480 is that location, can you please reconsider?

Also, what is the hold up on the new tram station elevator? There has not been any progress for months on that site and the old elevator is breaking down more than ever. Is there a reason why they have not been working on it?

Lastly, the construction on the new Southtown building blocking the side walk is a traffic accident waiting to happen. The residents of 480 are forced to cross the street without a crosswalk and the view from both directions is limited for drivers and pedestrians. This paired with area driveways results in a lot of cars turning and people walking with no crosswalk. Can RIOC address this?


SUSAN: We chose the dog park location based upon the locations of other dog parks throughout NYC’s parks. The issues you raise can be handled with fencing, gate locations, and landscaping. Also, by locating the run there, we will have more open common space for all residents when Riverwalk buildings 8 and 9 are completed. Hudson-Related has shared some of their recreational ideas for that open space and it will be a great addition to the island. We have reviewed the issues you raised about the dog run with PSD (our Chief and Deputy have extraordinary experience in security and safety from their NYPD days) and they are confident that this location will not cause any unmanageable concerns.

Regarding the Manhattan Tram elevator, the construction drawings had to be revised because soil borings demonstrated a need to change the pile foundation design to support the structure. RIOC hired additional engineers to assist in the necessary modifications, which have been completed. We are now awaiting NYC Department of Buildings’ and NY Transit Authority approval, as well as the NYC Parks permit in order to proceed.

PSD was made aware of sidewalk safety issues around the new Southtown building construction and added signage for the protection of our pedestrians.


HEY SUSAN!

Any thoughts to providing charging stations for electric/hybrid cars in Motorgate? Electric cars are the future. Can you help by providing a means to help clean the air on Roosevelt Island?

SUSAN: Yes, we are doing more than thinking about charging stations! After the completion of the waterproofing project at Motorgate Garage, (we expect the project to be approved by the Board in April), we have plans for charging stations, new striping, and new signage. The current plan is for four charging stations, with the possibility of expanding to six.

HEY SUSAN!

Hopefully this $8.7 Million sea wall initiative has taken into consideration the rapidly rising sea level that came very close to taking RI out during storm Sandy?

SUSAN: The project you are referring to is for new seawall railings around the entire island. The seawall railing contractor has been repairing concrete damage on the face and topside of the seawall as they work northward. We also have a FEMA grant which is being used to repair an existing part of the seawall made of stone that was damaged in hurricane Irene.

We are in the midst of a seawall replacement project which will completely transform and beautify the east and west shorelines of Southpoint Park. The existing concrete retaining wall will be replaced by a “rip rap” revetment – basically, a sloping berm of armor stones that serve a similar purpose as a retaining wall, but is more cost effective to install and maintain, while allowing better access to the water. Along with the revetment, the project will remove the scrub brush along the existing seawall and replace it with professionally landscaped paths and seating for island residents and visitors. Once the scrub is removed in these areas, the views will be excellent and this area will become much more attractive as a destination for residents, especially in the warmer months.

We are continuing to evaluate the rest of the existing seawall to determine where replacement with a durable revetment is needed.

HEY SUSAN!

The men's locker room at the Sportspark pool has fallen into a state of disrepair. Issues include: handicap-access showerhead malfunctioning, one of the urinals malfunctioning, and the swimsuit-drying machine not working. This is on top of the chronic issues of: warped, dusty and rusting lockers, soap dispensers frequently empty, and a lack of anti-slip matting that make the wet floors a daily hazard for little wet feet. Thank you so much for your team's attention to this. I understand that a complete overhaul of the facility (while long overdue) would be a large investment. But routine plumbing repairs, some anti-slip mats, and closer attention to things like soap & paper towels would cost little and go a long way.

SUSAN: Thank you for reaching out regarding the locker rooms at Sportspark. We have a significant project addressing the bathrooms, locker rooms, HVAC system, and much more, which we intend to bring to the Board on March 7th in order to move forward with construction/design drawings.

We will address the other points you have raised with our maintenance staff. Thank you for bringing them to our attention.

Do you have a question you’d like to have answered by RIOC President & CEO Susan Rosenthal? Send it to the subject HEY SUSAN! at information@rioc.ny.gov. Want to report a problem? Send us feedback at rioc.ny.gov/Requesttracker.aspx.

Tuesday, June 5, 2018

What's Going On With Roosevelt Island Sportspark Facility Renovations And Program Improvements - Cornell Tech Students Submit Sportspark Renovation Proposal To RIOC

The Roosevelt Island Operating Corp (RIOC) operates the Sportspark Facility. According to RIOC:

... Sportspark is located just south of the Tramway Plaza on Roosevelt Island. The facility opened in 1977 and is available for the public to use on a membership, drop-in, or permit basis. Permit price varies according to the event, date, and number of hours.

The Facility

The Sportspark Complex is designed to offer numerous athletic opportunities for the New York City community. This indoor athletic recreation facility is equipped with a pool, gymnasium, multipurpose room, and locker room areas. Sportspark offers multiple indoor athletic and general fitness opportunities for all ages throughout the year....
Sportspark Image From Google Maps

The Sportspark facility is in need of building renovations and program improvements. The Roosevelt Island Residents Association (RIRA) Island Services and Planning Committees have asked to meet with RIOC to provide community input on Sportspark renovations, improvements and future programing. To date, RIRA has not been successful in obtaining a meeting with RIOC on Sportspark issues.

RIOC President Susan Rosenthal reported on the status of Sportspark renovations and community input in her April Community report: According to Ms. Rosenthal:
Sportspark Renovation

RIRA also recently asked us to review their report and ideas for the Sportspark renovation project. While we have more plans to solicit community input on this project, we first should update you on the plan’s current state.

The first Sportspark RFP, set to be released by mid-June, is for design services and biddable documents only; not for physical renovation (that will be addressed in a subsequent RFP). Once we have a firm in place, then we will engage you, and the RIRA committee (and utilize our Cornell community study on possible programs) to receive your input and ideas on the renovation.

Members of our staff have reviewed the information RIRA provided, of which a majority involves facility concerns that we are aware of and agree should be addressed with the design.

We recognize RIRA is excited about the project and so are we. We look forward to working together. I will share additional updates as the project moves along.
Below are excerpts from the December 2017 Cornell Tech Sportspark Student Report.
Executive Summary

This report constitutes the recommendations for Sportspark improvements based on the discussions between Mary Cunneen and the Cornell Tech student team, as well as objective data gathered by a community-wide survey. The goal is to take advantage of the planned resources for renovation to make Sportspark more available, accessible, and relevant to the community, as well as drive conversion from daily passes to memberships. To this end, we recommend a use case for the upper floor, elucidation of Sportspark information, opening enabling facility amenities outside of class-hours, the creation of additional activities, and other suggestions as determined by the information we collected....

... Closing Thoughts

The biggest current problems with Sportspark are unclear messaging to potential patrons, a lack of “open-gym” activities, misalignment with the needs of some community members, and maintenance concerns. Our goal for this proposal was to address those problems, and we believe that the renovation provides a perfect opportunity to solve many of them. We hope that Sportspark can benefit from some of the suggestions provided here, and that the survey data collected can help guide future decisions that are out of scope of the topics discussed herein....

... Most commonly cited issues/suggestions from the Additional Comments section:

The locker rooms need renovation, including:
  • Fix the showers to have adjustable water temperature o Add hooks to hang towels
  • Fix toilet stall doors
  • Showers should be sanitized regularly
  • Soap dispensers should be filled
The website needs to be updated to be more navigable and clearer to readers

There should be a weight room with a trainer

Extend open hours (6am-10pm)

The water temperature in the pool is too cold

Make a group-priced membership available

Make the multipurpose room nicer with a softer floor

Add more family activities

Add more Yoga and Swimming lessons

Increase awareness of the facility across RI

Basketball Court should be mopped more frequently

Add Tennis lessons

Add Yoga-specific membership option

Add Cardio equipment

Add mirrors to multipurpose room

Establish partnership with Cornell Tech

Better AC in multipurpose room

Reconsider swim-cap rule for younger children
and here's the full Cornell Tech Student Sportspark Renovation report.

Wednesday, January 25, 2017

Roosevelt Island Sportspark Facility Re-Opening Delayed Again Until Mid February - But Sportspark Passed It's Boiler Inspection Today Says RIOC

The scheduled re-opening of Roosevelt Island's Sportspark facility following renovations

 Sportspark Image From Google Maps

has been delayed once again from before Thanksgiving 2016

Image From RIOC

to mid-January 2017 and now mid February 2017.

During January 24 Roosevelt Island Operating Corp (RIOC) Operations Advisory Committee meeting, RIOC Vice President of Operations Shelton Haynes reported that delays in boiler inspection have kept the Sportspark facility from re-opening but that the boiler inspection is scheduled for today. Everything else is ready to go at Sportspark.

As long as the boiler inspection is approved, RIOC anticipates Sportspark re-opening in mid February.

Mr Haynes added that the locker room renovations will not close the Sportspark facility.

Here's the discussion.



Just learned from RIOC President Susan Rosenthal that Sportspark passed the boiler inspection.

Thursday, January 12, 2017

When Will Roosevelt Island Sportspark Renovations Be Completed? Facility Will Re-Open As Soon As Boiler Can Be Turned On Says RIOC But No Firm Date Yet

As previously reported, the renovations to the Roosevelt Island Sportspark facility

 Sportspark Image From Google Maps

that began last August were scheduled to be completed before Thanksgiving.

Image From RIOC

In December, the Roosevelt Island Operating Corp (RIOC) announced that Sportspark renovation problems would delay the re-opening until Mid January.

During the January 4 Roosevelt Island Residents Association (RIRA) Meeting, RIRA Common Council Member Janet Falk asked RIRA Island Services Committee Chair Aaron Hamburger if he knew when Sportspark will re-open. Mr. Hamburger answered
... I'm convinced that it will be later than scheduled... I think we are at least a month or maybe two months away from opening....
Mr Hamburger added that RIOC will begin renovations of the locker room in April.



On January 5 I asked RIOC President Susan Rosenthal:
Any update on when Sportspark will reopen?

Is mid January still the plan?
Ms Rosenthal replied later that day:
It's still the plan but I cannot confirm the actual date since a few players need to be coordinated in order to make sure we have heat (the hook-up of the new boiler is in its final stage). Stay tuned....
I learned on January 10, that the Palladino Academy Indoor Soccer Practice was scheduled for January 17 at Sportspark so I asked RIOC:
Has a date been selected for opening Sportspark?

One of the Soccer groups has announced that they will be using Sportspark on January 17.
RIOC Vice President of Operations Shelton Haynes replied:
At this time point in time, we are still awaiting dates for inspections for the work on the boiler. After which, they will authorize Con Ed and the manufacturer to finally turn on the boiler. We are doing everything in our power to expedite this process. As soon as we can confirm a date that is certain, we will advise accordingly.
So, still no firm date for opening of Sportspark - Stay tuned.

RIOC explained reasons for renovations delay here.

Friday, April 29, 2016

Roosevelt Island Sportspark Facility To Close For Renovations In August, Reopen By Thanksgiving Says RIOC - Will Future Roosevelt Island Sportspark Be Operated By Equinox Or Other Private Entity?

Sportspark Image From Google Maps

The Roosevelt Island Operating Corp (RIOC) Real Estate Development Advisory Committee April 26 meeting discussed the upcoming renovations and temporary closing of the Sportspark Facility (full audio web cast of meeting here). According to RIOC Acting President Susan Rosenthal, the Roosevelt Island Sportspark Facility will close temporarily starting about August 15, 2016 for renovations to include the installation of a new roof, a new boiler and repairs to the pool. The Sportspark facility will probably re-open by Thanksgiving.

No work will be done during these renovations for improvements to the locker rooms and showers.

Ms Rosenthal added that although it need not be discussed during this meeting, future potential plans for the long term use and management of Sportspark should be addressed at a later date including possibly issuing a Request For Proposals seeking a private operator with the financial ability to undertake large capital improvements. Ms. Rosenthal noted that Sportspark:
... needs alot of work... a real renovation would cost a huge amount of money .... $50 million of capital...
and:
... Once Cornell is open up and we have splashy new buildings over there,  Sportspark is going to look really lousy....
Also:
... the truth is the Island is going to change whether we like it or not...
RIOC Director Margie Smith expressed concerns about a private operator for Sportspark, including fees that would be charged to residents, as well as questioned the need for extensive renovations beyond what is necessary to fix Sportspark. Ms Smith advocated that:
... the people on the Island get to use it like the original intent was...
RIOC Director Howard Polivy added:
... when and if we seek out an operator we can require that the residents enjoy a very special rate...
to which Ms Rosenthal replied:
Absolutely.
Here's the full April 26 RIOC Real Estate Development Advisory Committee discussion on Sportspark renovations.



RIOC also wishes to conduct a users survey of Sportspark. Members of the Sportspark Users Group met with RIOC in 2014 to discuss issues about the facility. 

As reported last November 15:
At yesterday's November 3 Roosevelt Island Operating Corp (RIOC) Audit Committee meeting discussion (audio web cast of meeting here) of the proposed RIOC 2016-17 Fiscal Year Budget, RIOC Director Howard Polivy noted that the budget included funds for:

.... an ambitious plan for Sportspark ....
I asked Mr. Polivy what were those ambitious plans for Sportspark. Mr. Polivy replied the ambitious plans listed in the proposed budget include::

  • HVAC
  • Electric
  • Roof
  • Pool
  • Concrete Restoration and Reconstruction
  • Replace Windows and Doors
  • New Flooring Squash/Ping Pong/Gym
  • Upgrade Locker Rooms/Bathrooms/Ceilings Sportspark -
  • Façade Repointing/Repair
  • Outdoor Basketball Courts
Mr. Polivy added:
... Basically,  It's a project that will go through the space and rebuild it...
It looks like the current Sportspark renovation plan is less ambitious than what was described last November.

Wednesday, November 4, 2015

RIOC Has Ambitious Plans For Improvements At Roosevelt Island Sportspark Facility Says Board Director At Audit Committee Meeting Yesterday

Reported yesterday that:

... contractors are currently working to replace a broken pool pump motor and damaged electrical components at the Sportspark pool. The pool will remain closed until further notice.
At yesterday's November 3 Roosevelt Island Operating Corp (RIOC) Audit Committee meeting discussion (audio web cast of meeting here) of the proposed RIOC 2016-17 Fiscal Year Budget, RIOC Director Howard Polivy noted that the budget included funds for:
.... an ambitious plan for Sportspark ....
  Sportspark Image From Google Maps

I asked Mr. Polivy what were those ambitious plans for Sportspark. Mr. Polivy replied the ambitious plans listed in the proposed budget include::
  • HVAC
  • Electric
  • Roof
  • Pool
  • Concrete Restoration and Reconstruction
  • Replace Windows and Doors
  • New Flooring Squash/Ping Pong/Gym
  • Upgrade Locker Rooms/Bathrooms/Ceilings Sportspark -
  • Façade Repointing/Repair
  • Outdoor Basketball Courts
Mr. Polivy added:
... Basically,  It's a project that will go through the space and rebuild it...
RIOC President Charlene Indelicato reported that due to the Cornell Tech campus project work previously being done on the North Road adjacent to the Sportspark, interior work could not be done at the Sportspark. Now that the Cornell Tech North Road work is completed, Sportspark interior work can start but not before a new Sportspark boiler is installed.

Here's the discussion



and Sportspark items (Page 8, budget item amounts are per thousand)

Image From RIOC Proposed 2016-17 Proposed Budget Page 8

in the RIOC Proposed Fiscal Year 2016-17 Budget.

Monday, November 24, 2014

Roosevelt Island Sportspark User Thanks RIOC For Smooth Transition To Temporary Heating Boiler Following Steam Plant Shutdown - Notes Improvements To Locker Rooms And Water Temperature Too

Roosevelt Island Operating Corp (RIOC) President Charlene Indelicato reported last Saturday:

Sportspark Heating System

This week, the Health and Hospitals Corporation (HHC) informed us that the Island’s Steam Plant has been decommissioned and that steam heat will no longer be provided by the facility. Last spring, contractors installed a temporary boiler system at Sportspark to service the building in place of steam heat. As this temporary heating system is already in place, no disruption to the facility’s schedule is planned at this time. Going forward, RIOC’s Engineering department will work with contractors on the installation of a permanent solution for Sportspark. Once a work schedule is in place and installation begins, the public will be advised of any effects construction will have on the facility’s schedule.
Image Of Sportspark Temporary Boiler

Sportspark Users Group organizer Roberta Kleinman noted today:
A HUGE THANK YOU to RIOC for the smooth transition from powering Sportspark via the Steam Plant to the Temporary Boiler. The change was made with virtually no inconvenience to the community. Thank you!!

Also, the air and water temperatures appear to be back to an average for the entire community! I for one, had a fabulous swim this morning! Also, I am pleased to see improvements in the locker rooms such as the installation of a new bench in the women's locker room and new, more hygienic garbage cans!

Many thanks!
More on Steam Plant closing
 
   Image Of Roosevelt Island Steam Plant

 and Sportspark Pool issues from previous post.

Tuesday, August 26, 2014

Fleas, Fleas & More Fleas Health Hazard Covering Roosevelt Island Sportspark Pool Shower Walls For Months Says Disgusted User - Will RIOC Clean It Up?

A Roosevelt Island resident and Sportspark Pool user shares these photos taken yesterday of fleas

Image Of Fleas On Roosevelt Island Sportspark Men's Shower Wall (look closely)

covering the Sportspark men's shower walls. According to the Sportspark User:
The showers in the Sports Park have been covered with fleas for months,

Image Of Fleas On Roosevelt Island Sportspark Men's Shower Wall (look closely)

which is a public health hazard. Hopefully it is cleaned up before someone calls the department of Health or 311. I'm sure the pool management will follow up or they'll close down the pool.

Image Of Fleas On Roosevelt Island Sportspark Men's Shower Wall (look closely)

In the meantime, beware the bugs and shower at home.
The Sportspark Pool is operated by the Roosevelt Island Operating Corp (RIOC).

  Image Of Sportspark Pool From RIOC

There is also a newly formed Sportspark Users Group that advocates for improvements at the facility.

Here's a July 10, 2014 report from the Sportspark Users Group which includes:
... Improved Sanitary Conditions in the Locker Rooms

This is a two part issue;

  1. The facility is old, it looks dirty and broken down even after industrial strength cleaning. A major renovation would be required to fix this (more on this below).
  2. However, although I see some efforts to improve daily cleanliness, the locker rooms are still often dirty. Discussion with RIOC included the possibility of posting a cleaning schedule, but this has yet to be implemented. We look forward to improvements in this area.....
More on the Sportspark Users Group here and here.

Wednesday, May 7, 2014

Roosevelt Island Residents Forming Group To Improve Conditions At Sportspark Pool - Users Invited To Join And Share Your Concerns

Are you a user of the Roosevelt Island Sportspark pool with concerns about how it is operated?

 Sportspark Image From Google Maps

If yes, consider joining the newly organized Sportspark Users Group.

Roberta Kleiman and Fred Gautier are leading the organizing efforts for the Roosevelt Island Sportspark Users Group. Ms. Kleinman and Mr. Gautier report:
CONCERNS ABOUT SPORTSPARK POOL

In conjuction with the Roosevelt Island Residents Association (RIRA) Island Services Commitee, a group of us brought our concerns about Sportspark to the Roosevelt Island Operating Corp (RIOC). Thus far RIOC has addressed only a handful of these issues fully. The majority of concerns which we conveyed have not been clearly addressed, nor have we received any communication about a plan for remedy. This is particularly disconcerting as the initial list of concerns sent to RIOC are rather straight forward, for the benefit of the entire community, and not a matter of personal preference.

Our goal is to work together with RIOC to help improve conditions at Sportspark pool so that our community can continue to enjoy this facility that we are fortunate enough to have!

If you wish to join the Sportspark User’s group, please email us at: sportsparkusers@gmail.com

Issues Awaiting Response from RIOC

Improved Sanitary Conditions in the Locker Rooms

The lockers rooms are consistently filthy and need to be cleaned daily. Many would like to know what the current schedule is.

Opening At Scheduled Time

This is of particular concern during weekday mornings.

Better Regulation of Air and Water Temperature

Do not keep windows and/or door open when it is cold enough for lifeguards to wear sweatpants and Jackets.

Do not backwash (adding a couple of hours worth of approximately 58 degree tap water while the pool is open).

Additional Issues

(These have not been forwarded directly to RIOC)

Pool Closure for Repairs during the Off-Season (sometime during the slowest months of December thru March, with a preference for December to cause the least amount of inconvenience)

Additional Heating Units in the Locker Rooms are needed for the coldest weather.

Rules Should be Enforced (for example coaching, particularly on the weekends leads to unsafe conditions and overcrowding, street shoes on the pool deck leads to water contamination), swim caps for all, etc.

Reconsideration of Pool Schedule (to accommodate increased Island population, particularly families)

Communication regarding whether RIOC plans to close Sportspark during exterior demolition of Goldwater Hospital (the temporary boiler is outside, accross the road from Goldwater)

Topics for Discussion:
  • What repairs are going to be done at the end of the year?
  • Are there any plans for repairing, cleaning (industrial strength) or renovating the locker rooms?
  • What are RIOC’s plans for Sportspark during Cornell construction?
  • Revisting the topic of overnight lockers.
Issues Addressed by RIOC

Let’s Make Sure We Have a Pool to Swim In

Charlene Indelicato explained RIOC’s plan to heat Sportspark in “The RIOC Column” dated April 26th. Erica Spencer, RIOC’s Community Relations specialist, added by email, one piece of important information. Ms. Spencer said, “Please note that the temporary broiler is in place until the permanent system is installed.” Thank you Ms. Indelicato for making this information public and for all your efforts to keep Sportspark in continuous operation!
Contact Sportspark Users Group here.

Wednesday, April 11, 2012

Residents Ask When Will Roosevelt Island Fountains Be Fixed and Sportspark Locker Rooms Cleaned Up? RIOC Replies

Image of Tram Fountain Closed For Repairs

Readers of Roosevelt Island Operating Corp (RIOC) President Leslie Torres recent Report To The Community commented on these issues. From Cheshire Kitty:
Is there ... timeframe as to when the Blackwell House fountains will be restored?  It's pleasant to enjoy these fountains during the summer. 
Westview Girl:
I would like to see RIOC invest in cleaning up the locker rooms and dressing rooms and lift the swim cap rule, women should have to put their hair in pony tail if below the shoulders, but the swim cap rule is so wrong, to enforce it is wrong ... if Ms Torres would go and use the showers and have to walk in the dressing rooms she herself would suggest things be bleached ... cleaned and updates.  Would not cost that much to freshen up the locker rooms and showers and put some bright paint and color there.

the memberships would go up if it was cleaner and brigher and more updates...so, when will that happen? 
and Yet Another RIer:
I agree with the state of the locker rooms. They are disgusting. They have been disgusting ever since the pool opened to the public. About swim caps: it's also men who are required to wear a cap if their hair is below shoulders. It's a very outdated thing to require (especially if you look at the history of swim caps it's outright sexist) but pretty much all indoor pools have the same requirement.
I asked RIOC Vice President of Operations Fernando Martinez:
Readers of this post asked when the fountains at the Tram Plaza and Blackwell House will be fixed. Also, is there any plan to clean and repair the locker rooms at Sportspark.

Do you have any comment?

Thank you.
Mr. Martinez replied:
The parts and materials for the fountains are on back order. We do have a delivery date from the supplier.

The Sports Park locker rooms are cleaned daily, and they were painted about 2 years ago.  We are having preliminary internal discussions on an overall Sports Park rehabilitation project.